Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | footway, kelsostreet, roundabout, widened |
Date time: | 3.11pm, Saturday 23rd March, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Probably the start of the cycleway alluded to in #107051.
Comments reflect the views of the original submitter only.