Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | crack, kelvin, kelvinwalkway, ncn756, path, retainingwall, wall |
Date time: | 11.25am, Friday 17th May, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Glasgow City Council is planning some work to fix this retaining wall on the Kelvin Walkway.
Comments reflect the views of the original submitter only.