Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | contraflow, govan, roadworks, underconstruction |
Date time: | 3.21pm, Sunday 7th July, 2019 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The end of the Burleigh Street contraflow cycle track currently under construction. The route to Water Row is via Pearce Street.
Comments reflect the views of the original submitter only.