Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | cobbles, ncn7, ncn75, surface, transition |
Date time: | 12.03pm, Friday 29th November, 2019 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A poor change of surface on the path from Crookston Road into Rosshall Park.
Comments reflect the views of the original submitter only.