Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | uruguay |
Date time: | 3.44pm, Monday 2nd December, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Crosing to new segregated foot and cycleway by Ruta 5 entering Rivera, Uruguay
Comments reflect the views of the original submitter only.