Add to Gallery: | Add this photo to a Gallery |
Category: | Bike sharing scheme: A problem that needs to be fixed |
Tags: | bikehire, cyclesonly, dockingstation, droppedkerb, ebikehire, filteredpermeability, kerb, nextbike, obstruction, roadclosure |
Date time: | 1.18pm, Sunday 2nd February, 2020 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
With the dropped kerb on the right, the cycle track connecting North Woodside Road to Hopehill Road/Maryhill Road junction is blocked by the hire bike. Weaving around the hire bike thus becomes necessary, when having the dropped kerb in the middle would have avoided this.
But the Connecting Woodside project will (eventually) reconfigure this area. (See also #113074.)
Comments reflect the views of the original submitter only.