Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cardonaldquietway, diagram1057, kerb, langlandsroad, pavementparking, strip |
Date time: | 3.45pm, Thursday 1st October, 2020 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Langlands Road cycleway restarts as a designated strip of asphalt outside the shops. Despite the tyre marks on the kerb, there is no dropped kerb, and cycle access is from the narrow toucan crossing.
Comments reflect the views of the original submitter only.