Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | a81, bollards, connectingwoodside, cycletrack, garscuberoad, hybrid, segregation, stepped, underconstruction |
Date time: | 2.27pm, Friday 16th October, 2020 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Finishing work still required at the southern end of the Garscube Road protected cycle lane. It will connecting into the underpass and other existing cycle infrastructure through Cowcaddens.
Comments reflect the views of the original submitter only.