Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | crossing, cyclesignals, junction, pavementcycling, railing, scw, slow, transition, underconstruction |
Date time: | 2.15pm, Friday 2nd April, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The South City Way taking shape at the transition between two-way and one-way cycle tracks at the north end of Pollokshaws Road. I'm not convinced the layout will be used as the designer intended.
Surprisingly, no use has been made of the angled kerbs that have been used a short distance away.
Comments reflect the views of the original submitter only.