Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | diagonal, swcw, tactiles, transition |
Date time: | 2.48pm, Friday 2nd April, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The tactiles seen in #70961 have now been installed with the bars parallel to the cycleway, but there's nothing in the regulations to say a diagonal installation is acceptable.
Comments reflect the views of the original submitter only.