Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | 20mph, cycletrack, popup, reallocation, transition, twoway |
Date time: | 2.46pm, Wednesday 28th April, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction.
Here the old painted track across the footway from the underpass meets the new track, where previously there were on-road painted lanes.
Comments reflect the views of the original submitter only.