Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | armadillos, bollards, continuous, cycleparking, cycletrack, junction, popup, reallocation, twoway |
Date time: | 2.47pm, Wednesday 28th April, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction.
The cycle track is continous and marked well across the Hill Street junction.
Comments reflect the views of the original submitter only.