Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | cones, cyclesignals, cycletrack, loadingbay, popup, reallocation, stop, trafficsignals, twoway |
Date time: | 2.47pm, Wednesday 28th April, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction.
The cycle track ends at the Renfrew Street junction at a low-level cycle traffic signal, allowing safe passage into the final section of Cambridge Street. The word 'STOP' appears on the carriageway again. A loading bay has been provided for the shops, and one of the old cycle lanes can be seen passing through it.
Comments reflect the views of the original submitter only.