Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | droppedkerb, end, path, resurfaced |
Date time: | 3.53pm, Tuesday 4th May, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The path from Prospecthill Circus to Polmadie Road is being rebuilt. This end is pretty much complete.
Comments reflect the views of the original submitter only.