Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | canal, forthandclydecanal, ncn754, resurfacing, surface, towpath |
Date time: | 1.58pm, Monday 17th May, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A section of Forth & Clyde Canal towpath has been resurfaced, between Cadder and Stockingfield.
Comments reflect the views of the original submitter only.