Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | canal, construction, forthandclydecanal, ncn754, resurfacing, stockingfield, surface, towpath, works |
Date time: | 1.53pm, Monday 17th May, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The resurfaced section of the Forth & Clyde Canal towpath will tie into the work at Stockingfield Junction, where a bridge is being built across the canal.
Comments reflect the views of the original submitter only.