Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | armadillos, cyclelane, footway, glasgow-cumbernauld, kerb, lining, roadworks, shareduse, underconstruction, workinprogress |
Date time: | 4.54pm, Wednesday 19th May, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Installation work on a protected cycle lane in Royston Road. Alterations appear to have been made.
Comments reflect the views of the original submitter only.