Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | bridge, cycletrack, kerb, ncn756, rebuilt, swcw, tradeston, twoway |
Date time: | 3.27pm, Thursday 3rd June, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Building work continues at Clyde Place. The cycle track approaching the Tradeston Bridge has been rebuilt. However, the position of the temporary railing directed me onto the new kerb which I wasn't expecting.
Comments reflect the views of the original submitter only.