Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, cycleway, trafficsignals, underconstruction |
Date time: | 5.20pm, Sunday 13th June, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The North Canal Bank Street cycleway joins to a cycleway along part of Craighall Road, but the cycleway swaps to having the cycle side on the opposite side of footway. I'm guessing that this isn't complete and the traffic signals will be replaced.
Comments reflect the views of the original submitter only.