Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, cycleway, tactiles, underconstruction |
Date time: | 5.22pm, Sunday 13th June, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cycleway on Craighall Road continues as far as the entrance to Speirs Wharf. This is not a good place to cross the road, but it looks like traffic signals will be installed.
Comments reflect the views of the original submitter only.