Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a81, bollards, connectingwoodside, cycletrack, cycleway, garscuberoad, incomplete, stepped, surface, tactiles, twoway |
Date time: | 5.25pm, Sunday 13th June, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Still surfacing work outstanding at the south end of the Garscube Road cycle track.
Comments reflect the views of the original submitter only.