Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bikehire, bin, bollards, clutter, dockingstation, newbuild, nextbike, ramp |
Date time: | 7.45pm, Sunday 1st August, 2021 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new ramp from Firhill Road and Garscube Road up to the Forth & Clyde Canal and the bridge to the Claypits nature reserve is now open. In addition to the ramp, there are steps available for pedestrians.
Part of the Nextbike hire station has been moved onto the grass verge behind the electric docking points.
Comments reflect the views of the original submitter only.