Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | a81, bikehire, connectingwoodside, cycleway, dockingstation, garscuberoad, junction, kerb, link, nextbike, ramp, trafficsignals |
Date time: | 7.45pm, Sunday 1st August, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The tie-in between the bottom of the new ramp down from the Forth and Clyde Canal to Garscube Road is poor. A kerb blocks the entrance to the ramp from Firhill Road and a ramp has been provided facing Firhill Road but this appears to be for joining the Garscube Road cycleway, although if so, it leads users directly onto another kerb. Is it not finished perhaps?
The Nextbike docking station stands for regular non-electric hire bikes has been repositioned onto the grass verge.
Comments reflect the views of the original submitter only.