Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bridge, footbridge, glasgow-cumbernauld, m8motorway, motorway, sighthill, underconstruction |
Date time: | 7.55pm, Sunday 1st August, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Still plenty to do to connect up the replacement bridge across the M8 motorway between Townhead and Sighthill.
Comments reflect the views of the original submitter only.