Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | covered, cycleway, sec, walkway |
Date time: | 1.46pm, Thursday 19th August, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The covered walkway/cycleway at the SEC has reopened following the decommissioning of the Louisa Jordan Hospital.
Comments reflect the views of the original submitter only.