Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | a814, bridge, dualcarriageway, maintenance, ncn7, path, pavementcycling, verge |
Date time: | 1.24pm, Monday 30th August, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
I don't know what the purpose of that bar attached to the underside of the bridge is, but there's a bit missing now.
I'm sure the edge of the NCN7 cycle path next to the Clydeside Expressway was straight when it was installed, but is now getting covered over by the verge.
Comments reflect the views of the original submitter only.