Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: A problem that needs to be fixed |
Tags: | drainage, gully, kerb, new, olddumbartonroad, underconstruction |
Date time: | 4.40pm, Sunday 19th September, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Old Dumbarton Road into Ferry Road cycle track is still under construction, and there is no temporary kerb ramp to aid joining the carriageway. There is also a drainage gully oddly in the middle of the westbound cycle lane.
Comments reflect the views of the original submitter only.