Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | column, crossing, giveway, kerb, lamppost, lighting, zebra |
Date time: | 4.41pm, Sunday 19th September, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Still no raised crossing or dropped kerb to join the Benalder Street cycle track, which otherwise appears nearly complete, apart from the lamppost.
UPDATE: These issues have now been resolved, see #175144.
Comments reflect the views of the original submitter only.