Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cop26, sec |
Date time: | 2.53pm, Wednesday 20th October, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The SEC covered walkway itself appeared to be open for business, although whether it was possible to get out the other end I don't know, having diverted around the gyratory system due to the sight at #175151.
Comments reflect the views of the original submitter only.