Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Event or temporary issue |
Tags: | bad, busy, cop26, footway, shareduse, softsegregation |
Date time: | 4.11pm, Friday 29th October, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
No improvement at Argyle Street. However, the plastic barrier which had been pushed beyond the asphalt ramp has been restored to its intended position.
Comments reflect the views of the original submitter only.