Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | covered, crossing, cyclesignals, elephantsfeet, kelvin, pedestrian, rain, uncovered, wcw |
Date time: | 1.00pm, Monday 8th November, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cycle signals at the Argyle Street crossing have been partly uncovered. The tactile paving on this side of the pedestrian crossing has been removed, as have the bollards.
Comments reflect the views of the original submitter only.