Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | bollards, buchananwharf, crossing, giveway, parallel, redevelopment, slow, swcw, zebra |
Date time: | 11.51am, Sunday 5th December, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new cycle track connecting the Tradeston Bridge to West Street. The route to the right is only for going to Paisley Road now, since the diagonal crossing at the Kingston Street junction has been removed and mandatory turn signs point to Paisley Road. The route ahead is blocked (see #176479).
Comments reflect the views of the original submitter only.