Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | bag, cones, connectingwoodside, crossing, cyclesignals, elephantsfeet, filteredpermeability, junction, roadclosure, underconstruction, woodside |
Date time: | 12.58pm, Monday 18th April, 2022 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Construction of the rebuilt modal filter at North Woodside Road is nearly complete. The road and pedestrian traffic signals have been brought into use, but the cycle signals are still bagged up.
Comments reflect the views of the original submitter only.