Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bunhouseroad, crossing, cyclesignals, elephantfootprints, kelvin, wcw |
Date time: | 12.43pm, Wednesday 22nd June, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Bunhouse Road cycle traffic signals are finally operational, about a year after installation. On this occasion the signal was triggered by someone cycling on the footway opposite. The cycle and pedestrian phases do not occur in the same cycle of the signal phases, even when the pedestrian button has been pressed. See also #183675.
Comments reflect the views of the original submitter only.