Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | asphalt, bridge, canal, forthandclydecanal, narrow, resurfacing, towpath |
Date time: | 5.33pm, Tuesday 9th August, 2022 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cobbles under the Ruchill Street bridge have been replaced by asphalt, removing one hazard at this very narrow section of path built in modern times. See #92011 for previous surface.
Comments reflect the views of the original submitter only.