Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | basin, canal, park, portdundas, redevelopment, sighthill |
Date time: | 4.47pm, Monday 27th March, 2023 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The path from Port Dundas Basin leads around the corner of the basin and heads over to Pinkston Road. There is another step-free route (out of shot to the right) which leads to the Sighthill Bridge.
Comments reflect the views of the original submitter only.