Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 30mph, crossing, droppedkerb, kerb, park, path, redevelopment, refuge, sighthill, trafficisland |
Date time: | 4.50pm, Monday 27th March, 2023 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The path from Port Dundas Basin approaching Pinkston Road. The only dropped kerbs are at the crossing at the pedestrian refuge.
Comments reflect the views of the original submitter only.