Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | canal, cobbles, forthandclydecanal, resurfacing, surface, towpath |
Date time: | 4.53pm, Tuesday 4th April, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The resurfaced section of the canal towpath between Applecross Street and the Claypits bridge only starts at the end of the cobbles.
Comments reflect the views of the original submitter only.