Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | canal, forthandclydecanal, surface, towpath |
Date time: | 4.56pm, Tuesday 4th April, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Building work at Firhill means that the shortcut through the car park is not available.
Comments reflect the views of the original submitter only.