Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | clydegateway, eerr, transition |
Date time: | 11.16am, Sunday 16th October, 2011 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Start of footway cycle route on EERR, with no connection to side street.
Comments reflect the views of the original submitter only.