Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | busonly, busway, cage, crossing, fastlink, narrow, ncn756, railing, toucan |
Date time: | 3.30pm, Tuesday 22nd July, 2014 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Fastlink dedicated bus road will not permit cycling when it finally opens, so cyclists will be forced to mix with pedestrians on the NCN 75 riverside path or with motor vehicles on the adjacent road.
NCN 756 crosses here on a 3-stage tightly caged toucan crossing (see also #60136).
Comments reflect the views of the original submitter only.