Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, giveway, junction, priority, roadworks, shareduse, sideroad, sideroads, toucan, tradeston, trafficlights, trafficsignals |
Date time: | 2.36pm, Friday 11th September, 2015 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cycleway turns left via a wider shared-use footway section. For everywhere else, there is a multi-stage toucan crossing to the opposite side of the road (where the lady in hi-vis is waiting) for the Shields Road cycle track northwards, or to the far side of the junction for getting to Vermont Street. Alternatively, rejoin the carriageway.
I'm hoping the kerbs, both on the footway and the cycleway, will be fixed before it is finished.
Note the rope between the roadworks cones.
I've no idea why a pedestrian fire door is treated like a vehicle entrance.
Comments reflect the views of the original submitter only.