Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | barrier, bridge, pollokshields, tradeston |
Date time: | 2.46pm, Friday 11th September, 2015 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A bit of a gap between the long-term temporary bridge barriers and the resumption of the cycle track segregation, due to the gateway. Perhaps the temporary barrier could be lengthened a bit.
Comments reflect the views of the original submitter only.