Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | busway, crossing, desireline, fastlink, hotel, ncn7, ncn75, new, toucan |
Date time: | 9.46am, Sunday 4th October, 2015 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
While the cycle parking provision at the new Village development is welcome, I think we can all see what is going to happen due to the lack of a path directly into the site from the toucan crossing.
[Paving has since been provided.]
Comments reflect the views of the original submitter only.