Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | 20mph, a77, bridge, cyclelane, georgevbridge, hybrid, stepped |
Date time: | 10.19am, Tuesday 19th July, 2016 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
If you are going straight on from George V Bridge, the new stepped cycle lane is no use (see #82971), so must continue to use the carriageway, in lane 3. But there's a 20mph sign, so that makes it all right!
Comments reflect the views of the original submitter only.