Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | a77, bridge, cone, cyclelane, georgevbridge, hybrid, joint, stepped |
Date time: | 10.18am, Tuesday 19th July, 2016 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Bridge joints in the new stepped cycle lane on George V Bridge have still to be finished.
Comments reflect the views of the original submitter only.