Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | footpathclosed, ncn756, ramp, southbank, underconstruction |
Date time: | 10.45am, Thursday 1st September, 2016 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new path alignment along the south bank of the Clyde, with a straight path under construction in place of previous path with steps. #84282 shows view from other end.
Update of the completed path at #86787.
Comments reflect the views of the original submitter only.