Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: An example of good practice |
Tags: | droppedkerb, filteredpermeability, glasgowcycling, new, roadclosure, twitterimport |
Date time: | 10.48am, Wednesday 2nd November, 2016 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/twanduiv/status/793766763049652224 |
Credit: | Twan vanDuivenbooden [Twitter username: 'twanduiv'] |
Area: | Glasgow |
New build out and dropped kerb on Claythorn Street #glasgowcycling t.co/qwbkEQV2py
Comments reflect the views of the original submitter only.