Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | a804, diversion, fallen, sighthill, sign |
Date time: | 2.30pm, Tuesday 14th February, 2017 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Diversion sign for pedestrians and cyclists while Sighthill is being rebuilt. This sign is meant to last for 3 years, but it's only been a few months so far!
Comments reflect the views of the original submitter only.