Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Event or temporary issue |
Tags: | constructionsite, diversion, glasgow-cumbernauld, keepout, park, sighthill, sign |
Date time: | 2.36pm, Tuesday 14th February, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Routes through what was Sighthill Park closed due to redevelopment, and the bridge over the motorway is getting replaced at some point too.
More information at www.glasgow.gov.uk/sighthill
Comments reflect the views of the original submitter only.